    Default The End of the El Reconstruction is here, Market Street to be Repaved by the end of the month

    It took a long time..but its here, anyone finally happy?
    Graphic Designer, Social Media Consultant. Twitter: @Sdlaugh

  2. #2
    thoth's Avatar
    thoth is offline I LOOK LIKE THIS
    Join Date
    Jul 2009
    Location
    Cedar Park
    Posts
    4,261

    Default

    I would be if it didn't take them three years to pave the ****ing street.

    On a somewhat related note, I feel like 52nd Street and western Market Street are starting to slowly recover from being partially or totally crippled commercial zones during the reconstruction. In a minor way, but noticeable.

  3. #3
    Juntonian is offline Member
    Join Date
    Feb 2012
    Location
    Fort St. David's
    Posts
    62

    Default

    It's about time. The condition of that street is a total f***ing embarrassment. I figured it would be done before they wrapped up construction on the Karabots Center.

  4. #4
    schmoe is offline Member
    Join Date
    Aug 2009
    Posts
    58

    Default

    If I'm not mistaken, I believe the inner shoulder will be converted into bike lanes. Left bike lanes are not normal, but make sense under the El. Hopefully they address the transition to right bike lanes at 44th.

  5. #5
    thoth's Avatar
    thoth is offline I LOOK LIKE THIS
    Join Date
    Jul 2009
    Location
    Cedar Park
    Posts
    4,261

    Default

    Lotta space at 44th, I could see it. Will be curious to see how it works in practice. It's already cramped under there.

  6. #6
    Nytecat is offline Senior Member
    Join Date
    Sep 2009
    Posts
    152

    Default

    It's about friggin time. It didn't take them anywhere near that long to repave Frankford after Bridge-Pratt was demolished in 2004.

    For the record, the 31 bus reroute from Market to Chestnut and Walnut has been made permanent, right?
    Under the El, buses would be much more prone to delays and blockages.

  7. #7
    ogawk is offline Member
    Join Date
    Jun 2009
    Posts
    77

    Default

    The whole center median is a bit ridiculous. Today, I drove from 30th to 63rd and thought I'd die laughing at the people with their lawn chairs sitting and drinking. Only in Philadelphia...

  8. #8
    mixiboi's Avatar
    mixiboi is offline Philly Remixed
    Join Date
    Jan 2009
    Location
    Lawncrest
    Posts
    8,177

    Default

    Quote Originally Posted by Nytecat View Post

    For the record, the 31 bus reroute from Market to Chestnut and Walnut has been made permanent, right?
    Under the El, buses would be much more prone to delays and blockages.
    Don't know, but seeing how SEPTA hasn't said anything about going back...we will see next month(the next schedule change)
    Graphic Designer, Social Media Consultant. Twitter: @Sdlaugh

  9. #9
    Juntonian is offline Member
    Join Date
    Feb 2012
    Location
    Fort St. David's
    Posts
    62

    Default

    Someday our long civic nightmare will be over. From PlanPhilly: A City-wide Look at Ongoing Transit Construction Projects

    "The city is about half way through a streetscape project along Market Street from 45th to the 63rd streets. [sic] The project includes curb and sidewalk improvements, intersection improvements, street paving and new traffic signals. ... About one-third of the paving will be completed by the end of this fall, and [Darrin] Gatti, [the Streets Department’s chief engineer and surveyor] expects the new signals to go in this winter."

  10. #10
    thoth's Avatar
    thoth is offline I LOOK LIKE THIS
    Join Date
    Jul 2009
    Location
    Cedar Park
    Posts
    4,261

    Default

    A third by the end of fall? Jesus Christ what are they redoing Market St with mosaic tiles?

  11. #11
    mixiboi's Avatar
    mixiboi is offline Philly Remixed
    Join Date
    Jan 2009
    Location
    Lawncrest
    Posts
    8,177

    Default

    Quote Originally Posted by thoth View Post
    A third by the end of fall? Jesus Christ what are they redoing Market St with mosaic tiles?
    Pretty much, they are redoing the entire sidewalk and curb so that takes time, especially when they couldn't do it during the el work. This slow down the time that they have to do asphalt before winter, but it will be finish next year with new traffic lights(Snowstorms not withstanding)
    Graphic Designer, Social Media Consultant. Twitter: @Sdlaugh

  12. #12
    Jayfar's Avatar
    Jayfar is offline Junior Old Fart
    Join Date
    Dec 2008
    Location
    Christian St West
    Posts
    3,079

    Default

    Quote Originally Posted by thoth View Post
    A third by the end of fall? Jesus Christ what are they redoing Market St with mosaic tiles?
    Almost as costly as that, but less aesthetically pleasing:

    Stu Bykofsky: Those cement bubbles on sidewalk corners are costing you a lot of money!

    Here's the shocker: The cost of installing the now-mandated ramps at each of the city's 22,000 intersections will be $858 million, according to Streets Department Deputy Commissioner David Perri. (Ramps are upgraded when other paving work is done.)

    The cost is high in part because in 2010 the government mandated two ramps per corner instead of the previous one. It had a good reason. It always has a good reason.

    Installing new ramps eats up 65 percent of the city's $20-million annual paving budget, leaving only one-third for everything else, says Perri.
    “Guys like you I would dispatch with my roofing axe.” -- BootsywannabeACretin

 

 

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts

Search Engine Optimization by vBSEO 3.6.0 PL2